Side pinning method
Just like underpinning, adjust the building's level with hydraulic jacks!
We would like to introduce our proposed "Side Pinning Method." This method involves driving piles into the ground around the foundation's perimeter using a pile driver, and inserting steel pipes until reaching a hard and stable ground. The building is supported by brackets. Similar to under-pinning, the building's level is adjusted using hydraulic jacks. 【Main Benefits】 ■ Construction is possible even if further settlement is expected ■ Can be implemented in narrow spaces ■ Normal living can continue during construction *For more details, please download the PDF or feel free to contact us.
- Company:市田建設 本社
- Price:Other